1
/
of
8
Miyili
Miyili Towel Ring Bathroom Hand Towel Holder Square Style Towel Rack Wall Mounted Polished Stainless Steel, D06C
Miyili Towel Ring Bathroom Hand Towel Holder Square Style Towel Rack Wall Mounted Polished Stainless Steel, D06C
Regular price
$30.99 USD
Regular price
Sale price
$30.99 USD
Shipping calculated at checkout.
Quantity
Couldn't load pickup availability
About This
- Metal
- HIGH QUALITY - Made of premium SUS304 stainless steel, all metal construction, ensuring quality and longevity, performs better in anti-corrosion, anti-rust and anti-tarnish.
- POLISHED STEEL - Our towel rings is polished steel finish, the surface is smooth and delicate, easy to clean, and it offers enhanced visual appeal, suitable for different decoration styles (MODERN, SIMPLE, NORDIC).
- CLASSICAL APPEARANCE - Classic square style, smooth touching without scratches your hands, open side design for easy hanging. Add more modern elements for your room decor.
- CLEANING & SECURITY - The sturdy towel ring leaves enough space for damp towels to dry quickly that never worrying slide to the floor. Matches our bathroom modern fixtures beautifully and provides a safe and neat household environment to you.
- EASY INSTALLATION - NO assembly required, can be EASILY mounted on a variety of surfaces including, but not limited to tile and drywall. Harware pack included. Any question, please feel free to contact our customer service.
Overview
- Color : Polished Steel
- Material : Stainless Steel
- Finish Type : Stainless
- Brand : Miyili
- Installation Type : Wall-Mounted
- Shape : Square
- Item Weight : 0.26 Kilograms
- Manufacturer : MIYILI
- UPC : 760570037928
Share
