Skip to product information
1 of 8

Miyili

Miyili Matte Black Hand Towel Ring, Stainless Steel Bathroom Towel Holder Square Towel Holder Kitchen Towel Hanger Wall Mount, D06B

Miyili Matte Black Hand Towel Ring, Stainless Steel Bathroom Towel Holder Square Towel Holder Kitchen Towel Hanger Wall Mount, D06B

Regular price $30.99 USD
Regular price Sale price $30.99 USD
Sale Sold out
Shipping calculated at checkout.
Quantity

About This

  • Metal
  • HIGH QUALITY - Made of premium SUS304 stainless steel, all metal construction, ensuring quality and longevity, performs better in anti-corrosion, anti-rust and anti-tarnish.
  • MATTE BLACK - Our towel rings is MATTE BLACK finish, the surface is smooth and delicate, easy to clean, and it offers enhanced visual appeal, suitable for different decoration styles (MODERN, SIMPLE, NORDIC).
  • CLASSICAL APPEARANCE - Classic square style, smooth touching without scratches your hands, open side design for easy hanging. Add more modern elements for your room decor.
  • CLEANING & SECURITY - The sturdy towel ring leaves enough space for damp towels to dry quickly that never worrying slide to the floor. Matches our bathroom modern fixtures beautifully and provides a safe and neat household environment to you.
  • EASY INSTALLATION - NO assembly required, can be EASILY mounted on a variety of surfaces including, but not limited to tile and drywall. Harware pack included. Any question, please feel free to contact our customer service.

Overview

  • Color : Matte Black
  • Material : Stainless Steel
  • Finish Type : Stainless
  • Brand : Miyili
  • Installation Type : Wall-Mounted
  • Shape : Square
  • Manufacturer : MIYILI
  • UPC : 760570037911
View full details